REFURBISHMENT PRIMARY SCHOOLS

Performed in record time from July to September, the school "S.Serafino Gnutti" has been energetically redeveloped. The operation consisted of constructing the outer coating of the walls, replacing window insulation, installing a photovoltaic system and replacing the heat generators and lighting fixtures. All this has allowed this building to be Class B Cened certified.